From M/s. Larsen and Toubro Limited
GTC/735A/2015 – Phase 13 substation – 09 No’s
GTC/26/2016- Manateq substation - 4 Nos.
GTC /371A/2010 – Phase X S1, S2 & S6 Substation.
GTC /488D/2012 – Phase XI S10 -04 Nos Substation.
From M/s.NCC
GTC/488B,G/2012 – Phase XI Package S5, S13,S14 -08 Nos S/s
GTC/643G/2014 – Phase XII -02 Nos Substation.
From M/s.Elsewedy
132/11kV Phase XII substation – 01 No
132/11kV Wukair 11 phase XIII substation
From M/s.ABB
GTC/735A/2015 – Phase 13 substation – 07 No’s
GTC/05/2004 – Phase VI substation
GTC/123/2006 – Phase VII Substation
GTC/488F/2012 – Phase XI Addendum package – 01 No S/s
GTC/882/2017 - Al Kharsaa Solar PV Independent power for T&C Work.
From M/s.Electro-Mechanical Co. Qatar W.L.L
Testing for 30No's of Package substation at Al Kharsaa Solar PV
Independent power plant.
Power Plants
ABB – T&C of 400/220 kV s/s at Umm al Haul Power Plant.
Substation, MV and LV Service Equipment testing at RAF A, RAF B.
Ras Abu Fontas Hyundai - Dismantling old reactor and installation of new kVAR Reactor at Umm AL Houl Power plant.
OIL & GAS
SPIE - Supply of TIG and ARC certified welder and Helpers.
Electrical panel installation and cable lying inside vessel at NKOM.
Fixing of Sensors at Various Location inside Dolphin Energy.
GASAL – TAR and Annual Maintenance for both Plant - @ RasLaffan inside ORXY and @MIC inside Qatar Steel.
GULFAR – Testing and commissioning of Off Shore QP HULAUL station
DODSAL – T&C of 220/132/33kV Common Seawater Cooling
System Substation at RasLaffan
Punjllyod – MPPL 18” Project at QP Mesaieed Plant
KEMCO – T&C support for Barzan Camp onshore Project
LEASCON – Testing and commissioning of HT, LT Motor and LV
Service Equipment in Dolphin Energy Plant Exp 02,
Siemens LLC (Oil and Gas ) – Revamping 0f complete 33kV, 11kV,
and 3.3kV Substation Testing and commissioning at
QASCO Plant.
Process Plants
ELSEIF – MV and LV Service Equipment Testing of all
Security Gate at New Doha International Airport
Punjllpyd–Fuel Handling system MV &LV Equipment Testing
at New Doha International Airport.
Five FCB – T&C of HT and LT Motor in Qatar National
cement plant.
Water System
Acciona Agua - 5 Years Maintenance of Umm al Houl Plant
and Ras Abu Fontas A3 water treatment plants.
VA Tech Wabag -Electrical and Instrumentation Installation
and Testing and Commissioning work at DSSTW plant.
Maintenance
SNC LAVALIN - 70No’s Transformer Annual maintenance
Contract at QP District
Siemens WLL - GTC/788/2017 – Power Transformer Periodic
Maintenance work for all Kahramaa Existing substation
ABB - GTC/1000 – Power Transformer Periodic Maintenance
work for all Kahramaa Existing substations.
Alstom –GTC/501 / 2012 Condition Monitoring for 11500 Nos
of 11kV Distribution Substations around qatar
Alstom –Three Years Operation and Maintenance of
220/33/10kV QSTECH substation.
Alstom – One and Half years Operation and Maintenance of
132/33kV Lusail Rail transport substation.
Servtech – RTU modification and signal checks for 50 Nos
Existing Kharama substation.
Q Terminal - New Doha Port container berth complete electrical
equipment’s annual maintenance.
SPIE - Protections relay maintenance work at NKOM.
Siemens - GTC/906 – 220kV GIS Repair and Maintenance
work for Kahramaa substations.
GE - GTC/896/2017 – Condition based preventive
maintenance of 11kV Switchgear for all Kahramaa
substations.
GE - GTC/895/2017 –preventive maintenance of
OLTC for all Kahramaa substations.
VOLTECH Group is a reputed, experienced and professional Electrical Engineering Company with a proven background in the areas of Testing & Commissioning of medium and heavy-duty Electricals in the Power and Transmission Sector